Monday, June 15, 2009






After a wake up call from Andrea and hot breakfast of waffles from our wonderful cooks, the group shared in the prayer of St. Francis before setting out for work. Joined by Father Vince, the painting group worked hard, scraping and painting an entire house. All that remains is some simple sofet work. Both roofing groups put forth large amounts of effort and knocked off parts of the roof, probably a quarter of the way done with the tear off and replacement. The ramp site dug and set all the posts, meaning all that remains is framing and decking. The hardwood floor group set down all of the sheets of wood and now need to put tiles down. The bathtub at that same site is in the process of being removed and replaced. Overall, the group accomplished large amounts of work today.